- Technical assistance in all the phases of the project from the design to the final execution.
- A large range of live end and dead end anchorages and couplers, being always ready for any development or change according to the specifics needs of the project.
- The designed system was successfully tested according to the new European standard ETAG-013 for post-tensioning systems.
- The possibility to use metallic and PE/PP ducts depending on the project specifications
- Automatic and lightweight stressing equipment.
- Study of alternative design or construction method as an improvement for the optimum solution for every project.
- LN6 tanks
- Wind mills